|
The Tee mix being installed on #16 Tee. |
Last week we installed the tee construction mix on # 16 Tee which was the last phase of the project for this fall. We will use the winter months to allow for settling of the soil. Early next spring we will laser level the tee and install the bentgrass sod. Assuming the spring weather cooperates the tee should be open around the 1st part of May, 2013.